ABB and Tigo Compatibility Announced!
ABB has teamed up with Tigo to develop an operational compatibility between Tigo’s TS4 optimizer and ABB’s UNO-DM-PLUS line of inverters. The configuration that ensures design flexibility and compliance with 2014 & 2017 NEC 690.12 requirements. The energy production of a single-phase string inverter, the rapid shutdown function and an optimizer option provides installers a stronger solution to code compliant solar installations.
“Finding inverters that can perform under the demands of challenging roof configurations and comply with the latest code requirements can be difficult,” said Mario Thomas, string inverter product manager, ABB’s solar business in the U.S. “With these new code compliant options from ABB, installers have more options to choose from.”
The UNO-DM-PLUS-US family of single phase, solar inverters delivers high performance with excellent power density giving end users the maximum amount of energy production. This flexible inverter comes with embedded connectivity and an efficient communication protocol,which enables the UNO-DMPLUS-US to be easily integrated within any current or future device for smart building automation, smart grid integration and with third-party monitoring and control systems. The UNO-DM-PLUS-US also comes with remote Over-the-Air (OTA) firmware upgrade for inverter and components to enable remote software upgrades.
For jurisdictions that have not migrated to 2017 NEC 690.12, ABB’s string-level Rapid Shutdown 2.0 device provides a simple and cost-effective solution to implement. This product mounts directly to the PV mounting rail or PV module, and lay parallel to the roofing surface. It provides a fail-safe solution for emergency responders. Available in two configurations (single and dual), this rapid-shutdown device requires no extra conduit, which minimizes additional material cost and associated labor. Shutdown occurs at the rooftop box when the utility power is lost or when the PV system’s AC disconnect switch is opened.
The UL-certified third-party solutions offer Rapid Shutdown and optional MLPE configuration with string inverter power generation as well as the following advantages:
• Module-level monitoring– Predicting and conducting maintenance on solar installations is critical to ensure that they last beyond their expected 25-year lifetime. With full visibility of a system’s performance through module-level monitoring in 2-second increments, solar fleets can maximize system up-time, identify performance issues, and control operations and maintenance (O&M) costs.
• Safety–The UL-certified module-level Rapid Shutdown Solutions provide installers, EPCs, and PV plant owners the most cost-effective response to safety regulations like the National Electric Code (NEC) 2014 & 2017 requirements. For installations unencumbered by shading, the MLPE option provides the necessary safety and monitoring services to ensure systems meet local fire regulations and performance expectations.
• Optimization of Energy Harvest–With optimized modules, more roof space can be used to maximize energy production. This fixes module mismatch and increases design flexibility by optimizing each module when shade drops their performance. It addresses system-level inefficiencies and age tolerance while also benefiting from the module-level monitoring and safety features.
Once the inverter is installed, operators can turn to a smartphone to commission the unit via a simple, built-in web user interface. This enables them to gain access to features such as advanced inverter configuration settings and Aurora Manager, which facilitates OTA firmware updates (remote software updates).
Author: Kathie Zipp, senior editor of Solar Power World.
Subscribe to Solar Power World News here
The Tigo TS4-R-O Optimiser…
Enhance your system yield by adding Tigo optimisers to only the modules that are affected by shading. Perfect as a low-investment option for getting the most from a roof.
As an example if there are eight modules in total, and two are shaded, you could install 2 x TS4-R-O to overcome the shading.
View the Tigo TS4-R-O Optimiser here>>
SHOP for Products here:
Categories: POWER MANAGEMENT PACKAGES, SOLAR ACCESSORIES AND MOUNTING, Solar Photovoltaic (PV), MONITORING, POWER OPTIMIZERS
Tags: Monitoring, Optimizers, Solar Monitoring, Tigo Energy, Tigo Energy TS4-R Optimiser TS-4R-M BLUE
Brand: SMA Tigo
VIEW SOLAR ACCESSORIES HERE >>
Archives
- July 2021 (1)
- June 2021 (2)
- May 2021 (3)
- April 2021 (4)
- March 2021 (3)
- February 2021 (3)
- January 2021 (3)
- December 2020 (2)
- November 2020 (5)
- October 2020 (8)
- September 2020 (3)
- August 2020 (2)
- July 2020 (5)
- June 2020 (7)
- May 2020 (6)
- April 2020 (6)
- March 2020 (6)
- February 2020 (5)
- January 2020 (6)
- December 2019 (7)
- November 2019 (5)
- October 2019 (4)
- September 2019 (3)
- August 2019 (3)
- July 2019 (4)
- June 2019 (5)
- May 2019 (5)
- April 2019 (1)
- March 2019 (2)
- February 2019 (7)
- January 2019 (8)
- December 2018 (6)
- November 2018 (4)
- October 2018 (6)
- September 2018 (7)
- August 2018 (6)
- July 2018 (5)
- June 2018 (5)
- May 2018 (10)
- April 2018 (8)
- March 2018 (8)
- February 2018 (2)
- January 2018 (8)
- December 2017 (10)
- November 2017 (7)
- October 2017 (13)
- September 2017 (16)
- August 2017 (10)
- July 2017 (11)
- June 2017 (7)
- May 2017 (15)
- April 2017 (14)
- March 2017 (11)
- February 2017 (11)
- January 2017 (8)
- December 2016 (5)
- November 2016 (5)
- October 2016 (3)
- September 2016 (7)
- August 2016 (3)
- July 2016 (4)
- June 2016 (1)
- May 2016 (20)
- April 2016 (17)
- March 2016 (12)
- February 2016 (12)
- January 2016 (12)
- December 2015 (13)
- November 2015 (17)
- October 2015 (17)
- November 2014 (6)
STAY CONNECTED
CUSTOMER CARE
HOW TO ORDER
ABOUT US
Categories
Recent Posts
- Qualified Driver Shortage Leads to Restricted Services July 6, 2021
- More Than Half of UK Businesses Want To Invest In Renewables June 24, 2021
- The Shocking Change to Average Energy Bills June 7, 2021
- Commercial EV Charging Points Available May 16, 2021
- The switch from OLEV to OZEV – EV Grants UK May 15, 2021
- Ireland SEAI Grants 2021: What can I get as a homeowner? May 5, 2021
Archives
- July 2021 (1)
- June 2021 (2)
- May 2021 (3)
- April 2021 (4)
- March 2021 (3)
- February 2021 (3)
- January 2021 (3)
- December 2020 (2)
- November 2020 (5)
- October 2020 (8)
- September 2020 (3)
- August 2020 (2)
- July 2020 (5)
- June 2020 (7)
- May 2020 (6)
- April 2020 (6)
- March 2020 (6)
- February 2020 (5)
- January 2020 (6)
- December 2019 (7)
- November 2019 (5)
- October 2019 (4)
- September 2019 (3)
- August 2019 (3)
- July 2019 (4)
- June 2019 (5)
- May 2019 (5)
- April 2019 (1)
- March 2019 (2)
- February 2019 (7)
- January 2019 (8)
- December 2018 (6)
- November 2018 (4)
- October 2018 (6)
- September 2018 (7)
- August 2018 (6)
- July 2018 (5)
- June 2018 (5)
- May 2018 (10)
- April 2018 (8)
- March 2018 (8)
- February 2018 (2)
- January 2018 (8)
- December 2017 (10)
- November 2017 (7)
- October 2017 (13)
- September 2017 (16)
- August 2017 (10)
- July 2017 (11)
- June 2017 (7)
- May 2017 (15)
- April 2017 (14)
- March 2017 (11)
- February 2017 (11)
- January 2017 (8)
- December 2016 (5)
- November 2016 (5)
- October 2016 (3)
- September 2016 (7)
- August 2016 (3)
- July 2016 (4)
- June 2016 (1)
- May 2016 (20)
- April 2016 (17)
- March 2016 (12)
- February 2016 (12)
- January 2016 (12)
- December 2015 (13)
- November 2015 (17)
- October 2015 (17)
- November 2014 (6)
DIY SOLAR PANELS, SYSTEMS, KITS & BATTERIES, OFF-GRID INSTALLER